E3. Publication of the project
- In Eng
- Hits: 6512
The action E3 was concluded
The dissemination leaflet of the project was published and disseminated in two versions: the first produced in the early stages of project implementation and more targeted at project presentation and the second one was developed in the final phase with the aim to illustrate the problems faced and the solutions made in place.
A 63-page publication of the project was also produced in Italian which illustrates the most significant technical aspects of the project.
Finally, the Layman's report 32-page document was produced in Italian and English with summary results and good practices performed by the project.
News about the progress of the action E3:
-25/05/2015- Inauguration of the trail "Truc San Martino" of Bussoleno
- Download the Layman's report of the project
- The final project document is available